TMBR: December 2025: Difference between revisions

From BusyBeaverWiki
Jump to navigation Jump to search
Polygon (talk | contribs)
Holdouts: added BB(2,7)
RobinCodes (talk | contribs)
Improved referencing
 
(3 intermediate revisions by 2 users not shown)
Line 6: Line 6:


== Holdouts ==
== Holdouts ==
* [[BB(6)|BB(6):]]
**There are 14 holdouts left to simulate up to 1e12 steps, and 312 to simulate up to 1e13 steps<sup>[https://discord.com/channels/960643023006490684/1239205785913790465/1447303829400846482 <nowiki>[1]</nowiki>]</sup>. The two lists can be found [https://docs.google.com/spreadsheets/d/10y2aMp9yZVLyN-nXAxgA25rw4EA_lJqn3Vxy2kB-m-U/edit?gid=806905077#gid=806905077 here].
* [[BB(3,4)|BB(3,4):]]
** TODO: Phase 2 stage 8
* [[BB(2,7)|BB(2,7):]]
* [[BB(2,7)|BB(2,7):]]
** Terry Ligocki enumerated 10K more subtasks, increasing the number of holdouts to 150,662,006 and making 50K of the 1 million subtasks enumerated.
** Terry Ligocki enumerated 10K more subtasks, increasing the number of holdouts to 150,662,006 and making 50K of the 1 million subtasks enumerated. (5/100)


[[Category:This Month in Beaver Research|2025-12]]
[[Category:This Month in Beaver Research|2025-12]]

Latest revision as of 19:13, 7 December 2025

Prev: November 2025 This Month in Beaver Research Next: January 2026

This edition of TMBR is in progress and has not yet been released. Please add any notes you think may be relevant (including in the form a of a TODO with a link to any relevant Discord discussion).

BB Adjacent

Holdouts

  • BB(6):
    • There are 14 holdouts left to simulate up to 1e12 steps, and 312 to simulate up to 1e13 steps[1]. The two lists can be found here.
  • BB(3,4):
    • TODO: Phase 2 stage 8
  • BB(2,7):
    • Terry Ligocki enumerated 10K more subtasks, increasing the number of holdouts to 150,662,006 and making 50K of the 1 million subtasks enumerated. (5/100)