TMBR: December 2025: Difference between revisions

From BusyBeaverWiki
Jump to navigation Jump to search
Polygon (talk | contribs)
Holdouts: Added BB(3,4) as todo
RobinCodes (talk | contribs)
Added relation 50K:1M eqv. 5:100 for readers to understand in context easier.
Line 9: Line 9:
** TODO: Phase 2 stage 8
** TODO: Phase 2 stage 8
* [[BB(2,7)|BB(2,7):]]
* [[BB(2,7)|BB(2,7):]]
** Terry Ligocki enumerated 10K more subtasks, increasing the number of holdouts to 150,662,006 and making 50K of the 1 million subtasks enumerated.
** Terry Ligocki enumerated 10K more subtasks, increasing the number of holdouts to 150,662,006 and making 50K of the 1 million subtasks enumerated. (5/100)


[[Category:This Month in Beaver Research|2025-12]]
[[Category:This Month in Beaver Research|2025-12]]

Revision as of 19:10, 7 December 2025

Prev: November 2025 This Month in Beaver Research Next: January 2026

This edition of TMBR is in progress and has not yet been released. Please add any notes you think may be relevant (including in the form a of a TODO with a link to any relevant Discord discussion).

BB Adjacent

Holdouts

  • BB(3,4):
    • TODO: Phase 2 stage 8
  • BB(2,7):
    • Terry Ligocki enumerated 10K more subtasks, increasing the number of holdouts to 150,662,006 and making 50K of the 1 million subtasks enumerated. (5/100)