TMBR: June 2026

From BusyBeaverWiki
Revision as of 20:44, 9 June 2026 by Tjligocki (talk | contribs) (Holdouts: Updated BB(2,7) enumeration)
Jump to navigation Jump to search
Prev: May 2026 This Month in Beaver Research Next: July 2026

This edition of TMBR is in progress and has not yet been released. Please add any notes you think may be relevant (including in the form a of a TODO with a link to any relevant Discord discussion).

Holdouts

  • BB(6)
    • mxdys solved two TMs with FAR.[1][2]
  • BB(2,6)
    • Andrew Ducharme reduced the number of holdouts from 413,513 to 412,086, a 0.35% reduction.[3]
  • BB(2,7)
    • Terry Ligocki enumerated 30K more subtasks, increasing the number of holdouts to 1,178,654,530. A total of 380K subtasks out of the 1 million subtasks (or 38%) have been enumerated.