TMBR: May 2026

From BusyBeaverWiki
Revision as of 09:09, 3 May 2026 by Polygon (talk | contribs) (Added BB(2,6) holdout reduction)
Jump to navigation Jump to search
Prev: April 2026 This Month in Beaver Research Next: June 2026

This edition of TMBR is in progress and has not yet been released. Please add any notes you think may be relevant (including in the form a of a TODO with a link to any relevant Discord discussion).

Holdouts

  • BB(2,6)
    • Andrew Ducharme reduced the number of holdouts from 536,112 to 533,764 via Enumerate.py, a 0.44% reduction.[1]
  • BB(2,7)
    • Terry Ligocki enumerated 20K more subtasks, increasing the number of holdouts to 749,156,843. A total of 24K subtasks out of the 1 million subtasks (or 24%) have been enumerated.[TODO]